Dedicated locality research platform

1st Habitable Floor

Ground

Views
--
Floor to Ceiling Height

--

Project Theme

Gated Bungalow Complex

Tower Name La Casa Bungalow 1 Fire Exits 1
Total Floors 2 Refuge Areas --
Number of Elevators -- Configurations Present 3.5 BHK
Flats Per Floor 2 Tower Layout
Tower Name La Casa Bungalow 2 Fire Exits 1
Total Floors 2 Refuge Areas --
Number of Elevators -- Configurations Present 4.5 BHK
Flats Per Floor 2 Tower Layout
Tower Name La Casa Bungalow 3 Fire Exits 1
Total Floors 2 Refuge Areas --
Number of Elevators -- Configurations Present 3.5 BHK
Flats Per Floor 2 Tower Layout
Tower Name La Casa Bungalow 4 Fire Exits 1
Total Floors 2 Refuge Areas --
Number of Elevators -- Configurations Present 3.5 BHK
Flats Per Floor 2 Tower Layout
Tower Name La Casa Row House A Fire Exits 1
Total Floors 2 Refuge Areas --
Number of Elevators -- Configurations Present 4.5 BHK
Flats Per Floor 2 Tower Layout
Tower Name La Casa Row House B Fire Exits 1
Total Floors 2 Refuge Areas --
Number of Elevators -- Configurations Present 4.5 BHK
Flats Per Floor 2 Tower Layout
Tower Name La Casa Row House C Fire Exits 1
Total Floors 2 Refuge Areas --
Number of Elevators -- Configurations Present 4.5 BHK
Flats Per Floor 2 Tower Layout
Wing Name Bungalow 1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 2
Number of Plinth 1 Number of Stilts --
Wing Name Bungalow 2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth 1 Number of Stilts 1
Wing Name Bungalow 3 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure --
Number of Plinth -- Number of Stilts --
Wing Name Bungalow 4 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 2
Number of Plinth 1 Number of Stilts --
Wing Name Row House A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 2
Number of Plinth 1 Number of Stilts --
Wing Name Row House B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 2
Number of Plinth 1 Number of Stilts --
Wing Name Row House C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 2
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31-05-2020
Possession Availability as per RERA
Proposed Date of Completion 30-11-2020
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 85
1 Sanitary Fittings Within The Flat/premises, Electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 70
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Leisure
  • Senior Citizen Zone
  • Pet Friendly
Green Features
  • Water Storage
Leisure
  • Senior Citizen Zone
  • Pet Friendly
Green Features
  • Water Storage
Leisure
  • Senior Citizen Zone
  • Pet Friendly
Green Features
  • Water Storage
© Propscience.com. All Rights Reserved.