Dedicated locality research platform

1st Habitable Floor

1st

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

A beautifully planned and executed offering by Raj Realty

Tower Name A Wing Fire Exits 1
Total Floors 8 Refuge Areas 1
Number of Elevators 1 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name B Wing Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name C Wing Fire Exits 1
Total Floors 8 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name A Wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name B Wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 12
Number of Plinth 1 Number of Stilts 1
Wing Name C Wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2022
Possession Availability as per RERA
Proposed Date of Completion 31-12-2017
Revised Proposed Date of Completion 30-12-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100
View More
View Less
Amenities
Sports
  • Kids Play Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Video Door Phone
  • Earthquake Resistant Design
Leisure
  • Sit-out Area
Green Features
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Kids Play Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Video Door Phone
  • Earthquake Resistant Design
Leisure
  • Sit-out Area
Green Features
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Kids Play Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Video Door Phone
  • Earthquake Resistant Design
Leisure
  • Sit-out Area
Green Features
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
© Propscience.com. All Rights Reserved.