Dedicated locality research platform

1st Habitable Floor

1st

Views
Water Body / City Skyline
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Gated complex with spectacular view of national park

Tower Name Wing C Fire Exits 2
Total Floors 23 Refuge Areas 4
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name Wing D Fire Exits 2
Total Floors 23 Refuge Areas 4
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name WING C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 2 Number of Stilts 2
Wing Name Wing D Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30/06/2023
Possession Availability as per RERA
Proposed Date of Completion 18-05-2020
Revised Proposed Date of Completion 30-12-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 75
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --