1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Amber Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name Beryl Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Charoite Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name Larimar Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Marcasite Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Natali Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name Pearl Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present 4 BHK
Flats Per Floor 4 Tower Layout
Wing Name Amber Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name Beryl Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name Charoite Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name Larimar Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name Marcasite Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name Natali Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name Pearl Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-12-2017
Revised Proposed Date of Completion 30-04-2018
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 70
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less