Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Highrise Tower

Tower Name Evershine Amavi 303 Phase 3 Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Evershine Amavi 303 Phase 3 Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Building No 6 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 7 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 8 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 9 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 24 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 25 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 26 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2023
Possession Availability as per RERA
Proposed Date of Completion 30-12-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 40
1 X Number Of Slabs Of Super Structure 5
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 20
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 20
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.