Dedicated locality research platform

1st Habitable Floor

Ground

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Small budget homes

Tower Name Building No. 4 Fire Exits 2
Total Floors 6 Refuge Areas --
Number of Elevators 1 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building No.5 Wing A Fire Exits 2
Total Floors 6 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building No.5 Wing B Fire Exits --
Total Floors 6 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building No.6 Wing A Fire Exits 2
Total Floors 6 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building No.6 Wing B Fire Exits 2
Total Floors 6 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Building no 4 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 6
Number of Plinth 1 Number of Stilts 1
Wing Name Building no 5 Wing A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 6
Number of Plinth 1 Number of Stilts 1
Wing Name Building no 5 Wing B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 6
Number of Plinth 1 Number of Stilts 1
Wing Name Building no 6 Wing A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 6
Number of Plinth 1 Number of Stilts 1
Wing Name Building no 6 Wing B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 6
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/03/2021
Possession Availability as per RERA
Proposed Date of Completion 30-09-2021
Revised Proposed Date of Completion 01-01-1970
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.