Dedicated locality research platform

1st Habitable Floor

4th

Views
--
Floor to Ceiling Height

--

Project Theme

38-storey residential complex in Rohinjan with 9 towers

Tower Name Turquoise Fire Exits 2
Total Floors 38 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name TURQUOISE Number of Podium 3
Number of Basements -- Number of Slabs of Superstructure 35
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-03-2022
Possession Availability as per RERA
Proposed Date of Completion 31-12-2017
Revised Proposed Date of Completion 30-09-2022
Sr. No Task/Activity % Work Done
1 Excavation 88
1 X Number Of Basement(s) And Plinth 88
1 X Number Of Podiums 71
1 Stilt Floor 64
1 X Number Of Slabs Of Super Structure 99
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 41
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 27
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 96
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 25
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 8
View More
View Less
Amenities