Dedicated locality research platform

1st Habitable Floor

-

Views
--
Floor to Ceiling Height

--

Project Theme

-

Tower Name Pearl Crest Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators -- Configurations Present 1 BHK,2 BHK,3 BHK,3.5 BHK,4 BHK
Flats Per Floor -- Tower Layout
Wing Name Pearl Crest Number of Podium 05
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2019
Possession Availability as per RERA
Proposed Date of Completion 31-12-2018
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 20
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 5
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.