Dedicated locality research platform

1st Habitable Floor

8 th first floor

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Allura Fire Exits 3
Total Floors 75 Refuge Areas 8
Number of Elevators 12 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Parkside Fire Exits 3
Total Floors 75 Refuge Areas 6
Number of Elevators 12 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Marquise Fire Exits 3
Total Floors 75 Refuge Areas 6
Number of Elevators 12 Configurations Present 3 BHK,4 BHK
Flats Per Floor 3 Tower Layout View Layout
Tower Name Trump Fire Exits 3
Total Floors 78 Refuge Areas 8
Number of Elevators 12 Configurations Present 3 BHK,4 BHK,5 BHK
Flats Per Floor 3 Tower Layout View Layout
Tower Name Kiara Fire Exits 3
Total Floors 78 Refuge Areas 8
Number of Elevators 12 Configurations Present 2 BHK,3 BHK,4 BHK,5 BHK
Flats Per Floor 3 Tower Layout View Layout
Wing Name Wing 1 to 5 Number of Podium 7
Number of Basements 4 Number of Slabs of Superstructure 80
Number of Plinth 5 Number of Stilts --
Possession Availability
Possession Date 31/12/2021
Possession Availability as per RERA
Proposed Date of Completion 31-12-2021
Revised Proposed Date of Completion 31-12-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 99
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 74
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 48
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 87
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 65
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 74