1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Tower A Fire Exits --
Total Floors 52 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower B Fire Exits --
Total Floors 52 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name Tower A Number of Podium 6
Number of Basements 3 Number of Slabs of Superstructure 71
Number of Plinth 1 Number of Stilts 1
Wing Name Tower B Number of Podium 6
Number of Basements 3 Number of Slabs of Superstructure 71
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2022
Possession Availability as per RERA
Proposed Date of Completion 12-01-2022
Revised Proposed Date of Completion 30-06-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 98
1 X Number Of Podiums 92
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 81
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 25
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 3
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --