Dedicated locality research platform

1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Om Satyam Niwas Fire Exits --
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 3 BHK
Flats Per Floor 3 Tower Layout
Wing Name Om Satyam Niwas CHS LTD Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/07/2020
Possession Availability as per RERA
Proposed Date of Completion 30-04-2019
Revised Proposed Date of Completion 31-07-2020
Sr. No Task/Activity % Work Done
1 Excavation 95
1 X Number Of Basement(s) And Plinth 95
1 X Number Of Podiums 70
1 Stilt Floor 95
1 X Number Of Slabs Of Super Structure 75
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 20
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 10
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 45
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.