Dedicated locality research platform

1st Habitable Floor

2nd

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Dubai Inspired Contemporary Architecture

Tower Name TOWER C Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name TOWER D Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name TOWER E Fire Exits 2
Total Floors 21 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name TOWER C Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER D Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER E Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 01-12-2025
Possession Availability as per RERA
Proposed Date of Completion 01-12-2026
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 40
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Sports
  • Badminton Court
  • Basketball Court
  • Cricket Pitch
  • Multipurpose Court
  • Tennis Court
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Gymnasium
  • Outdoor Gym
  • Indoor Games Area
Leisure
  • Amphitheatre
  • Deck Area
  • Sit-out Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Water Bodies / Koi Ponds
  • Green Zone
  • Water Storage
Business & Hospitality
  • Clubhouse
  • Multipurpose Hall
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Badminton Court
  • Basketball Court
  • Cricket Pitch
  • Multipurpose Court
  • Tennis Court
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Gymnasium
  • Outdoor Gym
  • Indoor Games Area
Leisure
  • Amphitheatre
  • Deck Area
  • Sit-out Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Water Bodies / Koi Ponds
  • Green Zone
  • Water Storage
Business & Hospitality
  • Clubhouse
  • Multipurpose Hall
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Badminton Court
  • Basketball Court
  • Cricket Pitch
  • Multipurpose Court
  • Tennis Court
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Gymnasium
  • Outdoor Gym
  • Indoor Games Area
Leisure
  • Amphitheatre
  • Deck Area
  • Sit-out Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Water Bodies / Koi Ponds
  • Green Zone
  • Water Storage
Business & Hospitality
  • Clubhouse
  • Multipurpose Hall
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
© Propscience.com. All Rights Reserved.