Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Gated complex

Tower Name Shree Siddhivinayak Tower Fire Exits 2
Total Floors 23 Refuge Areas 4
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout
Wing Name Shree Siddhivinayak Tower Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-06-2020
Possession Availability as per RERA
Proposed Date of Completion 31-12-2016
Revised Proposed Date of Completion 30-12-2020
Sr. No Task/Activity % Work Done
1 Excavation 90
1 X Number Of Basement(s) And Plinth 90
1 X Number Of Podiums --
1 Stilt Floor 50
1 X Number Of Slabs Of Super Structure 90
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 43
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 20
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 80
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 50
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.