Dedicated locality research platform

1st Habitable Floor

6th

Views
--
Floor to Ceiling Height

--

Project Theme

Strategically constructed

Tower Name R1 Fire Exits --
Total Floors 35 Refuge Areas --
Number of Elevators 5 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name R1 Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 35
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2020
Possession Availability as per RERA
Proposed Date of Completion 31-03-2021
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 88
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 96
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 57
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 5
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 65
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 35
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 8
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.