Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Premium Location

Tower Name Tower A Fire Exits 2
Total Floors 22 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 3 Tower Layout
Tower Name Tower B Fire Exits 2
Total Floors 22 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK,4 BHK,5 BHK
Flats Per Floor 2 Tower Layout
Tower Name Tower C Fire Exits 2
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present Studio,1 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower D Fire Exits 2
Total Floors 10 Refuge Areas --
Number of Elevators 2 Configurations Present Studio
Flats Per Floor 13 Tower Layout
Tower Name Tower E Fire Exits 2
Total Floors 5 Refuge Areas --
Number of Elevators 2 Configurations Present Studio
Flats Per Floor 13 Tower Layout
Wing Name TOWER A Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER B Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER C Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 16
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER D Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 10
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER E Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 6
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 17-12-2009
Revised Proposed Date of Completion 22-07-2018
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.