Dedicated locality research platform

Builder Information
Project Name
Violet- Building 16
Locality
Virar West
Sub Locality
--
Builder's Name
--
RERA Number(s)
P99000002573
Price Range
0.46 cr to 0.61 cr
Configuration Range
1 BHK , 2 BHK
Construction Status
Nearing Ready


Master Layout
Project Layout Project Layout by RERA
Number of Towers 6 Total Building Count 6
Number of Units 600 Sanctioned Building Court 6
Type of Development Complex Proposed but not sanctioned buildings count --
Land Parcel 2.83 Acre Aggregate Area (in sqmts) of recreational open space 11459.32
Layout View Layout
Project Overview
Project Name
Building No 16 Violet
Project Type
Residential
Project Status
On-going Project
Proposed Date of Completion
2017-12-31
Revised Proposed Date of Completion
2018-03-31
Number of Flats Sold
--
Built-up Area as per proposed FSI
(in sqmts)(Proposed but not sanctioned)

100
Total FSI
19199.64
Total Built-up Area as per approved FSI
19199.64

Amenities
Sports
  • Jogging Track
  • Kids Play Area
  • Gymnasium
Green Features
  • Waste Segregation
Leisure
  • Pet Friendly
Construction Status of Amenities - as per RERA
Amenities Available Percentage Detail
Internal Roads & Footpaths : Yes 100 Paver Blocks To Be Fixed
Water Conservation, Rain Water Harvesting : Yes 100 As Per Vvcmc Guidelines
Energy Management : No -- Na
Fire Protection And Fire Safety Requirements : Yes 100 As Per Fire Noc Given By Vvcmc
Electrical Meter Room, Sub-station, Receiving Station : Yes 100 Electrical Meter Room Provided
Aggregate Area Of Recreational Open Space : Yes 70 Rg Common For Entire Layout
Open Parking : No -- Na
Water Supply : Yes 20 On Commencement Of Vvcmc Water Supply
Sewerage (chamber, Lines, Septic Tank , Stp) : Yes 100 Septic Tank
Storm Water Drains : Yes -- To Be Connected To Vvcmc Storm Water Drains
Landscaping & Tree Planting : Yes -- As Per Tree Noc Given By Vvcmc
Street Lighting : Yes 100 To Be Completed Before Oc
Community Buildings : Yes 100 Available To Entire Layout And Handed Over
Treatment And Disposal Of Sewage And Sullage Water : No -- Na
Solid Waste Management And Disposal : No -- Na
Construction Status - as per RERA
Parking Name Proposed Booked Work Done
Garages -- -- --
Covered Parking -- -- --

Parking Available

Car Parking Units

Power Backup

-

© Propscience.com. All Rights Reserved.