Dedicated locality research platform

1st Habitable Floor

2nd

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Highrise Tower with Modern Amenities

Tower Name Brooklyn Park Phase 4 Wing B Fire Exits 1
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Brooklyn Park Phase 4 Wing C Fire Exits 1
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-07-2020
Possession Availability as per RERA
Proposed Date of Completion 31-07-2020
Revised Proposed Date of Completion 31-01-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement And Plinth 100
1 X Number Of Podium --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster Floorings 40
1 Sanitary Fittings Within The Flat --
1 Stair Cases Lift Wells And Lobbies 50
1 External Plumbing And Plaster 35
1 Installation Of Lifts, Water Pumps And Fire Fighters --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.