1st Habitable Floor

1st

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Highrise Tower with Modern Amenities

Tower Name D Wing Fire Exits 2
Total Floors 13 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name E Wing Fire Exits 2
Total Floors 13 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name F wing Fire Exits 2
Total Floors 13 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name D Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name E Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name F Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-05-2019
Possession Availability as per RERA
Proposed Date of Completion 31-05-2019
Revised Proposed Date of Completion 20-11-2020
Sr. No Task/Activity % Work Done
1 Excavation 100
1 Xnumber Of Basements And Plinth 100
1 X Number Of Podiums --
1 Stlit Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Flat/premises And Windows 100
1 Sanitary Fittings Within The Flat/premises, Electrical Fittings Within The Flat/premises 84
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100