Dedicated locality research platform

1st Habitable Floor

1st

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Affordable budget homes

Tower Name Building 1 Fire Exits 2
Total Floors 6 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Building 2 Fire Exits 2
Total Floors 6 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Building 3 Fire Exits 4
Total Floors 7 Refuge Areas --
Number of Elevators 3 Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor 12 Tower Layout View Layout
Wing Name Building No 2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 6
Number of Plinth 1 Number of Stilts 1
Wing Name BUILDING NO 03 WING A AND WING B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2025
Possession Availability as per RERA
Proposed Date of Completion 31-12-2025
Revised Proposed Date of Completion 03-12-2020
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.