Dedicated locality research platform

1st Habitable Floor

3rd

Views
--
Floor to Ceiling Height

--

Project Theme

Strategic location advantages

Tower Name Wing A Fire Exits 2
Total Floors 14 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Wing B Fire Exits 2
Total Floors 14 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name Tricity Luxuria Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30/09/2022
Possession Availability as per RERA
Proposed Date of Completion 30-03-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 70
1 Stilt Floor 85
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 80
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 94
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 23
View More
View Less
Amenities
Sports
  • Swimming Pool
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Leisure
  • Library / Reading Room
© Propscience.com. All Rights Reserved.