Dedicated locality research platform

1st Habitable Floor

4th

Views
--
Floor to Ceiling Height

--

Project Theme

Strategically constructed and located

Tower Name Alliance Fire Exits 2
Total Floors 14 Refuge Areas 6
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Alliance Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 01/05/2022
Possession Availability as per RERA
Proposed Date of Completion 01-08-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 80
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 35
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
Sports
  • Kids Play Area
  • Gymnasium
Leisure
  • Library / Reading Room
  • Senior Citizen Zone
  • Temple
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Power Back-up Generator
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Water Storage
© Propscience.com. All Rights Reserved.