1st Habitable Floor

4th

Views
--
Floor to Ceiling Height

--

Project Theme

Premium location advantages

Tower Name Wing A Fire Exits 2
Total Floors 27 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 2 Tower Layout View Layout
Tower Name Wing C Fire Exits 2
Total Floors 27 Refuge Areas --
Number of Elevators 2 Configurations Present 4 BHK
Flats Per Floor 1 Tower Layout View Layout
Tower Name Wing B Fire Exits 2
Total Floors 27 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 3 Tower Layout View Layout
Wing Name SHOPPING Number of Podium --
Number of Basements 1 Number of Slabs of Superstructure 3
Number of Plinth 1 Number of Stilts 1
Wing Name Wing A Number of Podium 3
Number of Basements -- Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Wing B Number of Podium 3
Number of Basements -- Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Wing C Number of Podium 3
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30/06/2022
Possession Availability as per RERA
Proposed Date of Completion 30-06-2022
Revised Proposed Date of Completion 30-06-2022
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/win --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less