1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Small budget homes

Tower Name Building 1 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 2 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 3 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 4 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 5 Fire Exits 3
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 6 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 7 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 8 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 9 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 10 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 11 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Building 12 Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name BLDG NO 1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 3 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 4 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 5 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 6 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 7 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 8 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 9 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 10 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 11 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name BLDG NO 12 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-06-2018
Possession Availability as per RERA
Proposed Date of Completion 31-12-2017
Revised Proposed Date of Completion 31-12-2018
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 90
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 20
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 80
View More
View Less