Dedicated locality research platform

1st Habitable Floor

5th

Views
--
Floor to Ceiling Height

--

Project Theme

Big residential Complex

Tower Name Wing A Fire Exits 2
Total Floors 33 Refuge Areas 5
Number of Elevators 3 Configurations Present 2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing F Fire Exits 2
Total Floors 33 Refuge Areas 5
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name Wing G Fire Exits 2
Total Floors 33 Refuge Areas 5
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name Wing H Fire Exits 2
Total Floors 33 Refuge Areas 5
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name Wing F Fire Exits 2
Total Floors 33 Refuge Areas 5
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 7 Tower Layout
Tower Name Wing G Fire Exits 2
Total Floors 33 Refuge Areas 5
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 7 Tower Layout
Tower Name Wing H Fire Exits 2
Total Floors 33 Refuge Areas 5
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 7 Tower Layout
Wing Name Wing A Number of Podium 4
Number of Basements 2 Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts 1
Wing Name Wing F Number of Podium 4
Number of Basements 2 Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts 1
Wing Name Wing G Number of Podium 3
Number of Basements 2 Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts 1
Wing Name Wing H Number of Podium 4
Number of Basements 2 Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2019
Possession Availability as per RERA
Proposed Date of Completion 31-12-2018
Revised Proposed Date of Completion 31-12-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 98
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 99
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 99
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 99
View More
View Less
Amenities
Security & Sanitation
  • Security System / CCTV
  • Intercom Facility
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
Green Features
  • Landscaped Gardens
  • Water Storage
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Sports
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Leisure
  • Steam Room
  • Sauna
Business & Hospitality
  • Banquet Hall
  • Conference / Meeting Room
  • Sky Lounge / Bar
  • Clubhouse
  • Multipurpose Hall
Security & Sanitation
  • Security System / CCTV
  • Intercom Facility
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
Green Features
  • Landscaped Gardens
  • Water Storage
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Sports
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Leisure
  • Steam Room
  • Sauna
Business & Hospitality
  • Banquet Hall
  • Conference / Meeting Room
  • Sky Lounge / Bar
  • Clubhouse
  • Multipurpose Hall
Sports
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Leisure
  • Steam Room
  • Sauna
Business & Hospitality
  • Banquet Hall
  • Conference / Meeting Room
  • Sky Lounge / Bar
  • Clubhouse
  • Multipurpose Hall
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
© Propscience.com. All Rights Reserved.