Dedicated locality research platform

1st Habitable Floor

1st

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Strategically constructed

Tower Name Govind Sagar C-Wing Fire Exits 2
Total Floors 6 Refuge Areas --
Number of Elevators 1 Configurations Present 2 BHK,3 BHK
Flats Per Floor 2 Tower Layout View Layout
Wing Name C Wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-03-2019
Revised Proposed Date of Completion 31-03-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 70
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 60
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 80
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 65
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Leisure
  • Sit-out Area
Vertical Transportation
  • High Speed Elevators
© Propscience.com. All Rights Reserved.