Dedicated locality research platform

1st Habitable Floor

3rd Floor

Views
Water Body / City Skyline
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Community lifestyle inspired by famous world cities

Tower Name Phase-1-Marina Fire Exits 2
Total Floors 31 Refuge Areas 10
Number of Elevators 5 Configurations Present 2 BHK,3 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name Phase-1- Opera Fire Exits 2
Total Floors 31 Refuge Areas 10
Number of Elevators 5 Configurations Present 2 BHK,3 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name Phase-1- Acropolis Fire Exits 2
Total Floors 31 Refuge Areas 10
Number of Elevators 5 Configurations Present 2 BHK,3 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name Phase-1-Manhattan Fire Exits 2
Total Floors 27 Refuge Areas 10
Number of Elevators 5 Configurations Present 2 BHK,3 BHK,4 BHK
Flats Per Floor 7 Tower Layout View Layout
Wing Name Marina - wing A of Building no 1 Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Opera- wing B of Building no 1 Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Acropolis- wing C of Building 1 Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Manhattan - Building no 2 Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 30
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2021
Possession Availability as per RERA
Proposed Date of Completion 31-12-2021
Revised Proposed Date of Completion 30-12-2022
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 100