Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

All exclusive 1-BHK apartments only

Tower Name Leaf Villa Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name LEAF VILLA Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 26-06-2019
Possession Availability as per RERA
Proposed Date of Completion 26-03-2019
Revised Proposed Date of Completion 26-06-2019
Sr. No Task/Activity % Work Done
1 Excavation 10
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor 10
1 X Number Of Slabs Of Super Structure 10
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 10
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 10
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 10
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 5
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.