Tower Name Primo Fire Exits 2
Total Floors 42 Refuge Areas 3
Number of Elevators 5 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Wing Name Tower C Number of Podium 6
Number of Basements 1 Number of Slabs of Superstructure 36
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31/10/2022
Possession Availability as per RERA
Proposed Date of Completion 30-04-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 80
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 10
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 25
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --