Dedicated locality research platform

1st Habitable Floor

4th

Views
--
Floor to Ceiling Height

--

Project Theme

Clubhouse, Recreation Zone & Lush Greenery

Tower Name Pinnacle Fire Exits 2
Total Floors 22 Refuge Areas 8
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Summit Fire Exits 2
Total Floors 22 Refuge Areas 8
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Pinnacle Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Summit Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30/06/2021
Possession Availability as per RERA
Proposed Date of Completion 30-06-2021
Revised Proposed Date of Completion 30-12-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 2
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 40
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --