Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name AVION Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK,4 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name CASA Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 3 Tower Layout View Layout
Tower Name DEW Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK,4 BHK,5 BHK
Flats Per Floor 3 Tower Layout View Layout
Tower Name Rehab Tower 1-Alpha Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK
Flats Per Floor 6 Tower Layout
Tower Name Rehab Tower 2-Breeze Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK
Flats Per Floor 6 Tower Layout
Tower Name Rehab Tower 4- Delta Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK
Flats Per Floor 6 Tower Layout
Tower Name Rehab Tower 5- Eve Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK
Flats Per Floor 6 Tower Layout
Tower Name Rehab Tower3-Coral Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK
Flats Per Floor 6 Tower Layout
Wing Name TOWER A - AVION Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER B - BLU Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER C - CASA Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER D - DEW Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Wing Name REHAB TOWER 1 - ALPHA Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name REHAB TOWER 2 - BREEZE Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name REHAB TOWER 4 - DELTA Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name REHAB TOWER 5 - EVE Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name Rehab Tower 3- Coral Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-03-2024
Possession Availability as per RERA
Proposed Date of Completion 30-09-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.