Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name A1 Fire Exits --
Total Floors 13 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,4 BHK
Flats Per Floor 3 Tower Layout View Layout
Tower Name B6 Fire Exits --
Total Floors 14 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,4 BHK
Flats Per Floor 3 Tower Layout View Layout
Wing Name SHREE SARASWATI CHS LTD BLDG B6 AND A1 Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2022
Possession Availability as per RERA
Proposed Date of Completion 30-12-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 65
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 93
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 70
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 60
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 35
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 10
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.