1st Habitable Floor

1st Floor

Views
Water Body / City Skyline
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name Sabari Horizon Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 3 BHK,4 BHK
Flats Per Floor 2 Tower Layout View Layout
Wing Name SABARI HORIZON Number of Podium 2
Number of Basements 1 Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-05-2019
Possession Availability as per RERA
Proposed Date of Completion 31-05-2018
Revised Proposed Date of Completion 31-05-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 The External Plumbistaircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. Ng And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Wthe External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wingater Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100
View More
View Less