Dedicated locality research platform

1st Habitable Floor

Ground Floor

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Eastern Express Highway,

Tower Name S2 Fire Exits --
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S3 Fire Exits 1
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S4 Fire Exits 1
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S5 Fire Exits 1
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S6 Fire Exits --
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S7 Fire Exits 1
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S8 Fire Exits 1
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S9 Fire Exits 1
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name S1 Fire Exits 1
Total Floors 15 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name S1 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name S2 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name S3 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name S4 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name S5 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name S6 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name S7 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name S8 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Nova - S9 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name T1 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name T2 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name T3 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name T4 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name T5 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name T6 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name T7 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name T8 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-05-2022
Possession Availability as per RERA
Proposed Date of Completion 23-05-2021
Revised Proposed Date of Completion 30-05-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.