Dedicated locality research platform

1st Habitable Floor

4th

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

All exclusive 2-BHK apartments.

Tower Name Alliance One Fire Exits --
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Alliance One Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 2
Possession Availability
Possession Date 31/07/2023
Possession Availability as per RERA
Proposed Date of Completion 31-01-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.