Dedicated locality research platform

1st Habitable Floor

First Floor

Views
--
Floor to Ceiling Height

--

Project Theme

Affordable housing

Tower Name MARVELLA B Fire Exits 1
Total Floors 17 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name MARVELLA C Fire Exits 1
Total Floors 17 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name MARVELLA D Fire Exits 2
Total Floors 17 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name MARVELLA E Fire Exits 2
Total Floors 17 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name MARVELLA G Fire Exits 1
Total Floors 17 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name MARVELLA F Fire Exits 2
Total Floors 17 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name MARVELLA B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts --
Wing Name MARVELLA C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts --
Wing Name MARVELLA D Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts --
Wing Name MARVELLA E Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts --
Wing Name MARVELLA F Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts --
Wing Name MARVELLA G Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30-06-2022
Possession Availability as per RERA
Proposed Date of Completion 30-12-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 42
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 70
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 25
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 17
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.