Dedicated locality research platform

1st Habitable Floor

5th Floor

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

All exclusive premium 2-BHK apartments

Tower Name Wing B Fire Exits 2
Total Floors 21 Refuge Areas 8
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name WING C Fire Exits 2
Total Floors 21 Refuge Areas 8
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Wing D Fire Exits 2
Total Floors 21 Refuge Areas 8
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name KUKREJA CLASSIC WING A Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Wing Name KUKREJA CLASSIC WING B Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Wing Name KUKREJA CLASSIC WING C Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Wing Name KUKREJA CLASSIC WING D Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/08/2022
Possession Availability as per RERA
Proposed Date of Completion 30-04-2028
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 90
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 95
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 20
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 5
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 27
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Nstallation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Sports
  • Basketball Court
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Earthquake Resistant Design
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Party Lawn
Leisure
  • Deck Area
  • Sit-out Area
Vertical Transportation
  • High Speed Elevators
Sports
  • Basketball Court
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Earthquake Resistant Design
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Party Lawn
Leisure
  • Deck Area
  • Sit-out Area
Sports
  • Basketball Court
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Earthquake Resistant Design
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Party Lawn
Leisure
  • Deck Area
  • Sit-out Area
© Propscience.com. All Rights Reserved.