1st Habitable Floor

1st

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Strategically Constructed and located

Tower Name C Wing Fire Exits 2
Total Floors 13 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 3 Tower Layout View Layout
Wing Name C WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2023
Possession Availability as per RERA
Proposed Date of Completion 30-12-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 90
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls,internal Plaster, Floorings Within Flats/premises, Doors And Windows Ot Each Of Flats/premises 38
1 Sanitary Fittings Within Flats/premises, Electrical Fittings Witihin Flats/premises 38
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks 53
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 36
1 Installations Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment/ Crz Noc, Finishing To Entrance Lobby(s),plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation/completion Certificate 2