Dedicated locality research platform

1st Habitable Floor

1st

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Big residential complex with 3 acres podium

Tower Name GREEN WORLD A1 WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD A2 WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD B WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 3 Tower Layout View Layout
Tower Name GREEN WORLD C WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD D WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD E WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD F WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD G WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD H WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name GREEN WORLD I WING Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name B WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name C WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name D WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name H WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name I WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Wing Name A1 WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name E WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name A2 WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name F WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name G WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name SHOPS Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 1
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31/12/2019
Possession Availability as per RERA
Proposed Date of Completion 31-12-2015
Revised Proposed Date of Completion 31-12-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 80
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 40
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 80
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 65
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.