Dedicated locality research platform

1st Habitable Floor

2nd

Views
--
Floor to Ceiling Height

--

Project Theme

Strategically located

Tower Name Tritan Meadows Fire Exits 2
Total Floors 13 Refuge Areas 6
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 2 Tower Layout View Layout
Wing Name Tritan Meadows Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 2
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-03-2018
Revised Proposed Date of Completion 31-03-2018
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 2
1 Stilt Floor 1
1 X Number Of Slabs Of Super Structure 13
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 100
View More
View Less
Amenities
Sports
  • Jogging Track
  • Kids Play Area
Security & Sanitation
  • Maintenance Staff
Green Features
  • Waste Segregation
© Propscience.com. All Rights Reserved.