Dedicated locality research platform

1st Habitable Floor

4th

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Big residential township

Tower Name Tower 01 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 02 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 03 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 04 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 05 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 06 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 07 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 08 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 09 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 10 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 11 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 12 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name TOWER 01 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 02 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 03 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 04 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 05 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 06 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 07 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 08 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 09 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 10 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 11 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name TOWER 12 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2027
Possession Availability as per RERA
Proposed Date of Completion 31-12-2027
Revised Proposed Date of Completion 30-12-2028
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 99
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 99
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 98
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 90
View More